CB Service Pros replaced the roof of a two-story building using Owens Corning Williamsburg Gray shingles under a strict weekend-only schedule. Despite limited access, delayed materials, and equipment issues, the team delivered on time with strong communication and on-site supervision.
This fast-paced commercial roofing project required detailed planning and precise weekend execution to meet a firm deadline tied to the client’s business reopening. Material availability, weather forecasts, and limited site access added complexity, with over 100 squares of shingles and extensive carpentry work scheduled in a narrow timeframe.
The client’s preferred shingles—Owens Corning Duration in Williamsburg Gray—were subject to a 2–3 week delay, impacting initial scheduling and requiring flexible planning. Additionally, the team installed 114 squares of shingles, two layers of underlayment, and completed structural carpentry involving new fascia and framing lumber, all within tight access conditions.
Limited space for dumpster placement and a delayed final pickup caused by equipment failure introduced further logistical pressure. A weekend forecast showing 60% chance of rain created added urgency to stay ahead of potential weather-related delays. Meeting the Monday morning reopening deadline required strong coordination between crew, suppliers, and CB Service Pros project leadership.
The client required the entire scope of work to be completed strictly over the weekend to avoid business disruption. Frequent, transparent updates were critical—especially given the building’s two-story elevation and tight site layout. Special attention was given to the customer’s request for specific materials and color preferences, along with consistent supervision to ensure safety and quality throughout.
CB Service Pros successfully delivered the project on time and with outstanding professionalism, despite weather risks, supplier delays, and a non-negotiable weekend deadline. The team demonstrated excellent coordination across suppliers, field crews, and project management to meet the client’s Monday business reopening goal without sacrificing safety, quality, or communication.
Crews installed 114 squares of Owens Corning shingles with a Rhino G underlayment and a second waterproofing layer, ensuring storm-readiness despite the wet forecast. Framing repairs and fascia replacements were completed simultaneously and with structural precision.
Throughout the weekend, the customer received real-time updates and hands-on oversight that helped build confidence and peace of mind. Issues like the delayed dumpster pickup were handled quickly and professionally, with zero impact on the project’s timeline. The presence of an on-site supervisor, paired with remote availability from the office team, created a seamless communication loop that made the client feel fully supported at every phase.
The project concluded on time with all deliverables completed, a clean and orderly job site, and a satisfied client able to resume business as scheduled on Monday morning.